Volkswagen Expects Battery, Raw Material Drive To Cost Up To $34 Billion
Four more plants will follow by the end of the decade, most likely in Spain, eastern Europe and two additional locations that have so far not been disclosed. Costs will be 1 billion to 2 billion euros per plant while capacity will range from 40 up to a maximum of 80 gigawatt hours (GWh)